Built to BS5169 this large 30 cubic meter air receiver will be kept outside . It has been grit blasted to SA2.5 and a two pack epoxy paint system to last over 10 years exposed to the worst weather Sheffield can throw at it. Built for Chapmans agricultural

20131214-121347.jpg