We have capacity….

We have capacity….

Can we do anything else for you ? Over the last few years we have set our stall out with buckets of training, new cranes, CNC plasma and welding gear, and FINALLY we have spare capacity to turn on, so we should cope comfortably with whatever you choose to throw...
We have capacity….

Gordon sizes up his next job !

Gordon knows how to tackle this – with a conservative estimate of 5 vessels a week (not all this big) he’s assembled and welded over 8000 Vessels over the last 37 years at Abbotts – not limited to welding, Gordon keeps us supplied with eggs &...
We have capacity….

CAD/CAM Pipe Development

Some nifty work with pipe development software and our CNC profile burner #CNC  This has made light work of developing the correct whole shape, size and position to fit these tangential branches straight into this manifold /air pig with the correct preps for...
We have capacity….

DIY Vessel Welding 

Pressure vessel back for “refurb” – Someone’s bodged a few extra connections since we made it  – I’ve seen dodgy welding but this takes the biscuit  !  The painting isn’t much better !  Nothing we...
We have capacity….

The History of ASME – boiler and pressure vessel code

Why ASME was formed – and mandatory but only in the USA. The following excerpt from ASME gives an insight into the evolution of this boiler and pressure vessel code. The ASME Boiler and Pressure Vessel Code (B&PVC) was conceived in 1911 out of a need to...